HST8 Plastic Bending of Portals
Penjelasan Produk
Two portal frames (pitched and rectangular) are mounted within two “ground” supports, in either a pinned or fixed condition. A proportioning bar is held horizontally by loading chains that run to the portal frame and to the screwjack loading mechanism (with integral load cell). Depending on the position of the loading mechanism on the proportioning bar depends on the extent of the load being applied either horizontally or vertically.
Kembali